The Daily

Tuesday, October 20, 2026

14th Street S.W. water main repair keeps lanes closed · Canada’s annual housing-start pace rose in September · One new Calgary building permit

The lead · In the industry · New permits

The lead

14th Street S.W. water main repair keeps lanes closed

City utility crews working around an open roadway excavation with water-main repair equipment, cones and lane closures, viewed from the edge of the work zone.
Reference photo — not an actual photo of the site.

A water main repair on 14th Street S.W. is still affecting traffic between 75 Avenue S.W. and Heritage Drive.

City crews started the work Friday, Oct. 16, after an unexpected depressurization of the pipe during repairs. The main supports Eagle Ridge and Heritage Park. Northbound and southbound lanes are closed through the work area, leaving one lane open in each direction. The City says the lane setup could change depending on the condition of the pipe, and significant delays are expected.

A boil water advisory ordered by Alberta Health Services remains in effect for the affected area. Residents are being told to bring tap water to a rolling boil for one full minute before drinking, cooking, brushing teeth, cleaning raw foods, preparing infant formula or juice, and making ice.

The repair is not related to the Bearspaw South Feeder Main and is not affecting Rockyview General Hospital. Crews expect the work to take some time, so plan access and deliveries around the closure.

City of Calgary newsroom

In the industry

Canada’s annual housing-start pace rose in September

Canada’s annual pace of housing starts rose three per cent in September, according to the Canada Mortgage and Housing Corporation.

The seasonally adjusted annual rate reached 248,896 units, up from 242,223 in August. The increase came as actual monthly housing activity was reported across the country.

For contractors, the national figure covers all housing types and regions, but it is another hard read on the volume of residential work moving through the market.

Daily Commercial News

New permits

One new Calgary building permit

Issued by the City since the last edition, biggest first. Values are the City's estimated construction cost.

  • $643K · New 4-unit townhouses

    North Glenmore Park · Amplitude Development

The last 7 days

21 building permits, $40M in City-estimated construction cost. Busiest communities: Seton (2), Beltline (2), Downtown Commercial Core (2).

Most permitted value by builder: Logel Homes ($13M), Reinheller Builders ($9.5M), Westcor Construction ($2.54M).

Calgary building permits

The network behind the daily

Calgary GCs post commercial work; reviewed subcontractors get asked directly. Free for subs, and we take no cut.