Tenant Improvement · Calgary

Tenant improvements that hit the move-in date.

Office TI, retail buildouts, professional services upgrades. Post each trade once, drywall, electrical, mechanical, finishes, and the reviewed Calgary crews in it reply.

Free for subcontractors · Reviewed by hand · Commercial only

About this project type

Tenant improvement is most of what commercial construction actually is in Calgary. Corporate offices upgrading floor by floor. Retail rebrands on 17th Ave. Professional services moving into a Beltline mid-rise. Each project runs on tight schedules, occupied-building coordination, and clean trade sequencing.

Syndex sends your request to the reviewed commercial members in each trade. Every member is approved by a person before joining, and each replies for itself: no application chase, no bidding wars.

Scope breakdown

What’s actually in a tenant improvement.

Demolition & strip-out

Selective demo around live MEP, ceiling tile strip, fixture removal, careful sequencing in occupied buildings.

Framing & drywall

Steel stud partitions, ceiling grids, fire-rated assemblies, level 4 or 5 finishes per spec.

Mechanical & electrical rough-in

Power, data, lighting, HVAC modifications, plumbing as needed. Coordinated rough-in is what gates the schedule.

Finishes

Paint, flooring, doors and hardware, millwork install. Sequenced after mechanical close-out.

Commissioning & punch

Inspections, TAB, controls commissioning, punch-list close-out before tenant move-in.

What to check first

Four things GCs verify before signing.

Occupied-building coordination

Most TI work happens in active buildings. Crews who've worked occupied TI know how to schedule loud and dusty work — early mornings, evenings, weekends — without disrupting tenants.

Permit timing gates the start

Calgary permit and inspection windows can backlog seasonally. Get the permit package in early, and confirm crew availability matches issuance timeline.

Sequencing — drywall is the bottleneck

TI schedules live or die on drywall pace. Mechanical and electrical rough-in must close cleanly before board goes up; finishes can't start until paint dries.

Match crew specialty to scope

Downtown high-rise TI crews are different from suburban TI crews. Specify the building type and zone — reviewed subs filter themselves in.

How Syndex works for tenant improvement

Post your TI request with the trade, the scope and the start date. It goes to every reviewed member in that trade who covers your area, and you see the ones who reply Yes or Call me, with their contact details and, where we hold one, the date on their WCB clearance letter.

No follow-up applications, no bidding rounds, and Syndex takes no cut of the work.

Reviewed by a personCommercial onlyBy application

Frequently asked

Tenant Improvement on Syndex — common questions.

How does a TI request reach subs?
It is emailed to the reviewed members in that trade who cover your area as soon as you post it. Put the start date in the request; crews who cannot make it will not say yes.
Do Syndex subs handle occupied-building TI work?
Say so in the request: after-hours work, dust control, tenant protocols. Then ask the crew who replies for a recent occupied-building job.
Can I post a multi-trade TI scope on Syndex?
Each post targets one trade. For multi-trade TI, post one request per trade. Subs respond by trade and you coordinate across.
Does Syndex cover residential or homeowner TI?
No. Commercial only — tenant improvements in office, retail, industrial, multi-family, and health care buildings.

Guides

Ready to post?

See who says yes.

Post the job once. It goes to the reviewed members in that trade who cover your area, and you see the ones who reply.